MIT Theater Almost Complete

We were the engineers of record for this adaptive reuse of an existing factory building to the new campus theater (Eng: Structures Workshop, Arch: DesignLab).  We added an additional level and roof as well as transfered various existing columns over large performance spaces, with new pile caps/foundations.IMG_5410

IMG_5378

MIT

 

Leave a Reply

Your email address will not be published. Required fields are marked *