Harpoon Brewary Takes a New Shape

We redesigned the entrance and created a new opening, grand stair and elevator in the existing waffle slab building.   This allows Harpoon to have more room to host beer tours and contains a large restaurant.   The structure is complete, here are a few pics...

 

Listening is an underrated sense to us Engineers

Seth Horowitz, an auditory neuroscientist at Brown University and the author of “The Universal Sense: How Hearing Shapes the Mind”, wrote a terrific article in the New York Times called The Science and Art of Listening which starts...

"Here's a trick question. What do you hear right now?  If your home is like mine, you hear the humming sound of a printer, the low throbbing of traffic from the nearby highway and the clatter of plastic followed by the muffled impact of paws landing on linoleum — meaning that the cat has once again tried to open the catnip container atop the fridge and succeeded only in knocking it to the kitchen floor."

The slight trick in the question is that, by asking you what you were hearing, I prompted your brain to take control of the sensory experience — and made you listen rather than just hear. That, in effect, is what happens when an event jumps out of the background enough to be perceived consciously rather than just being part of your auditory surroundings. The difference between the sense of hearing and the skill of listening is attention.   [Horowitz, NY Times 11/9/2012]

This trick of asking yourself what are you hearing right now, reminds us of the difference between listening and hearing.   Many of us have no trouble hearing sounds, but listening to meanings with our full attention is another matter.  Can we shut of our internal thoughts and really listen to our design team around us?   Can we listen to the Architect or Contractor or co-worker without assuming what they will say or without interruptions by our own thoughts?

Science is Applied Engineering

We were designing and building things long before we had a “scientific” methods and mathematical solution techniques – and we still do today.  Did we need to wait for mathematical understanding of a hanging chain before we could build catenaries?  Of course not.   We didn't need to wait for Galileo and Bernoulli to create architecture.   We didn't need Euler to design columns.  We as structural engineers should recognize that while science and math are critically important to what we do, they do not define us - and history tells us, they never did.  How can we be defined as applied scientists when engineering predates science? I am particularly suspicious of the idea that our masterbuilders, craftmen, and masons of the past did not understand flexure and compression basics (top of beam is in compression for example or rules for column slenderness).    They may not have had the proper formulas but they certainly had a better intuition than we give them credit.  Yes, Leonardo Da Vinci and Galileo were the first to "discover" bending stress by writing it down, but it was used as rules of thumb by our builders well before that time.

In the book "Structural Engineering:  The Nature and Theory of Design" William Addis quotes the following statement from Karl Terzaghi challenging the idea that theorey leads to practice:

History shows us that there is hardly a single concept of practical importance in the field of structural engineering that was not instinctively anticipated and used with success in design and construction by individuals or groups of engineers many centuries before applied mechanics came into existence.

In Henry Petroski's book Remaking the World, he states:

Some of the first modern engineers did not apply science but rather led science.  The science of thermodynamics may be viewed as an application of steam engines, and rational structural analysis as an application of bridge building.   The view of scientific discovery as depending on the ingenious craftsmanship of instruments, and thus following technology, convincingly flies in the face of the conventional wisdom that technology is mere applied science.  [Petroski, 1997, 17]

So according to this, Science is Applied Engineering

Structural Art - Heat Plant at Brown University

IMG_0543

IMG_0543

One of the finest examples of structural art in Providence is Brown University's Heat Plant on Llyod Ave.  It is a hidden gem.   The brick facade is sawtooth in plan at the base but straight at the top, creating beautiful hyperbolic brick sections that are repeated throughout. Both the Builder/Mason and the Architect/Engineer should be extremely proud and as a Providence resident I want to express my gratitude, thank you!

Nervi's Aesthetics and Technology in Building

Like artists, Engineers want to create beautiful words – when appropriate -  as well as satisfying the science of efficiency and the art of economy.  Nervi (1956) states that in order to do that, ones simply needs to work honestly.

Every improvement in the functionality and the technical efficiency of a product brings out an improvement in its aesthetic quality . . . there is no doubt that any product of high efficiency is always aesthetically satisfying. In the field of architecture, in which functional, statical, and economic needs are intimately mixed, truthfulness is an indispensable condition of good aesthetic results. [Nervi, 1956]

In addition, it is the engineer's personal ability that contributes to great works of structural art. The engineer that seeks personal excellence will see that transcend themselves into the built world – just like building with LEGOs as a kid, it just takes longer.

I remember visiting a project where I designed all the connections for a large box truss that supported four stories of concrete and spanned 100 feet. The erector and welder was proud to show me his work and described the installation, welds and details as a master craftsman would. He was not being self-serving—he was describing the work itself. He and I both knew that this was going to be covered up for no one else to see.  He was still deeply satisfied, as was I. I realized much later that the satisfaction was not really about the truss or even the workmanship (craft).  What he was really showing me was a manifestation of himself in the steel connection. The weld was beautiful and well-crafted, of course, and that was satisfying, too; but that is not really what he was feeling.  He was really showing me that he was a good human being; that he is quality just like the connection - he was virtuous.  The inanimate object was a reflection of him and it was beautiful. We can learn a great deal about how the outcome of our work is conceived in our minds the same way. While we are not particularly goal oriented, although we do see our work as a actively progressing towards "Quality" (in the present only - the future is unhealthy to think too much about). Just like this erector, we are not spectators. We like private concentration, working autonomously or in teams, and delivering quality work (not ourselves) to others.  The work is us, but that is our secret.  Maybe that is why virtue is the most important trait to engineers to contribute and create beautiful works.  Nervi thought so.

Erik to Present at ASCE Dinner 9/20

From ASCE-RI... "Erik Nelson is the co-author of an article which appeared in the March 2011 Civil Engineering Magazine.  He will be talking about the Linked Hybrid Project in Beijing China.  This was a massive undertaking combining engineering, art, and culture on a scale equal to the work taking place in Dubai.  We will be at the China Inn in Pawtucket.  Social hour is at 5:30, dinner at 6:30 on Sept 20."

2012-09-20 Dinner Announcement

Our Mattapan Farmers Market Bike Finished

See Boston Herald article... http://www.bostonherald.com/news/regional/view.bg?articleid=1061155633&srvc=rss

To all our friends, families, & supporters, BR+A+CE is proud to announce the completion of our first project, completed in collaboration with the Mattapan Food and Fitness Coalition and Brookwood Community Farm.

COME JOIN US TO CELEBRATE THE OFFICIAL UNVEILING AND LAUNCH OF THE MATTAPAN MOBILE FARM STAND AT THE MATTAPAN FARMERS MARKET THIS SATURDAY MORNING AT 525 RIVER STREET, MATTAPAN, MA.  SEPTEMBER 1, 11:30 AM. We're also thrilled to announce that the honorable Mayor Thomas Menino of Boston will be joining us for the unveiling ceremony. Mayor Menino's office generously pledged to match all donations to the Mobile Farm Stand Project, helping to ensure that we can deliver healthy, fresh produce to those in need this Fall and beyond!  We have been featured thus far in:

The Boston Herald Newspaper: http://www.bostonherald.com/news/regional/view.bg?articleid=1061155633&srvc=rss 

The Dorchester Reporter:http://www.dotnews.com/2012/coming-soon-pedal-powered-farm-stand-mattapan

Boston Globe Online : http://www.boston.com/yourtown/news/mattapan/2012/08/bracw.html

http://www.boston.com/yourtown/news/mattapan/2012/08/mobile_farm_stand_to_debut_sat.html 

Boston Innovation: http://bostinno.com/2012/08/01/farmers-markets-on-wheels-local-non-profit-raises-funds-for-a-pedal-powered-mobile-farm-stand/

Universal Hub: http://www.universalhub.com/2012/groups-planning-farmers-market-wheels-mattapan

Inhabitat: http://inhabitat.com/brace%E2%80%99s-mobile-farm-is-designed-to-bring-fresh-food-to-bostons-mattapan-neighborhood/

We had so much help, please visit our website to see our full list of sponsors and donors: www.br-a-ce.org/partners

EOR and Shear Connection Design of Steel Buildings

This blog entry addresses engineering, detailing, and erection of shear connections which represent 95% of the connections on every steel project. While they are often unfairly regarded as simple, they are rarely simple. Shear connections are complex due to the many different types of connections, number of limit states to check, as well as geometry and erection complexity. I will compare and rate the various methods the Engineer of Record (EOR) uses to provide shear demands. In addition, common types of shear connections will be presented and discussed. Shear connections are rarely controlled simply by the number and capacity of the bolts, and this paper will examine all limit states and discuss what to look out for during shop drawing review. There has been an ongoing debate as to the responsibility for the design of steel connections for building projects. As a result, different practices are used in design office varying across the country. For instance, on the west coast, the connections are often fully designed by be EOR as part of the construction documentations. Whereas, on the East coast, the connection design criteria and requirements are specified on the construction documents, but the final design is delegated to a licensed professional engineer (often hired by the fabricator) in the state of jurisdiction. I have the rather unique experience of seeing both sides of the issue of connections design, first as an EOR designing buildings, specifying connection criteria and checking the shop drawings for conformance. And now for the past four years, I have worked for fabricators to design connections based on the requirements specified by the EOR. It through seeing this issue from both sides, that I have an appreciation for the importance of the proper attention to shear connection design.

The 2010 edition of the AISC Code of Standard Practice outlines three options for the responsibility of the connection design. It presents a new (albeit already established and widely used) third option where by the EOR delegates the connection design to a professional engineer hired by the fabricator. This article is not a review of these options, but rather a presentation of the various practices used by the EOR to specify the shear connection requirements as seen by the author in review of hundreds of Construction Documents. It is the hope that it becomes clear that this new third option should become the industry standard for all connections including simple shear connections.

Why Every Shear Connection Must be Checked

Most often, at least on the East Coast, the steel connection design is relegated to the fabricator and the EOR provides demand criteria and typical details for the design of the connections. The fabricator either has an in house engineer or hires a connection engineer to design the connections (typically the shear, moment and bracing connections). .

However, in some cases the EOR does not always require the shear connections to be designed by an engineer, only the moment and bracing connections. This is a mistake. While shear connections are perceived as simple, they often are not. Take for instance the most common type of shear connection - the beam-to-beam connection, which is actually pretty complicated. As is commonly known, all beam-to-beam shear connections have a top cope, which can make the design tricky. In addition, the cope varies based on the size of the girder – so it is not uncommon for the same size beams with the same type of connection material (shear tabs, bolts, etc) will have very different capacities. For example, a W12x14 framing into a W16x31 has a very different capacity than a W12x14 framing into a W12x53 even if the shear connection is identical, see Figure 1.

Not only is the W12x14 double coped when framed into the W12x53, but the copes are larger (both deeper and wider due to the thicker and wider girder flange) in comparison with the W12x14 framing into the W16x31. The reduced section due to the large copes significantly decreases the shear capacity of the connection by nearly half. Often times shear connections are not controlled by the bolt shear capacity (especially light beams with double angle shear connections). They may be controlled by bolt bearing, shear rupture of the web, block shear capacity of the web or coped section capacity. In the following sections we will explore the various ways the engineer of record specifies shear demands in addition to clarifying the different shear connection types.

EOR Methods of Providing Demands

There are a variety of methods that are used by engineers to provide the fabricator the shear demands for the design of shear connections, and based the author's experience, some are good and some should be avoided.

Method 1: Provide Actual Shears on Each Beam on the Plans

This method is when the EOR provides the actual shear on the plans for every beam. This provides a uniform reliability in all of the members and the most accurate and efficient connections result.

 

Method 2: Provide a Table of Shear Values

This is method can work but it may be overly conservative for some beams on the project if done improperly. The table on the left is too simplistic and greatly overestimates the shear demand on lighter sections. For example, a W18x35 will have the same demand as a W18x76. The author derived the right table based on the plastic modulus of the beam and studied each connection type and number of bolts required. The right table is a good one and feels free to use it on your project if appropriate. You can select the ASD or LRFD method, it really doesn’t matter.

 

Method 3: Shear demands based on Length of Beam

This is a very common method. It is provided in many different forms on the general notes but it is always based on the maximum total uniform load tables in the AISC manual. These tables are based on the moment capacity of the beam in which the max uniform load is “backed out” and the shear is determined. So these tables are based on the following: M=wL2/8 and since V=wL/2, then M=VL/4 or V=M/(L/4). Paradoxically, the longer the beam - the smaller the shear demands. Therefore, beams will have to be designed close to their flexural capacity for a connection to be reasonable. Figure 2 clearly describes the absurdity of this method. The shorter member requires much larger bolts and tabs, in addition to the welded doubler plate to meet the demand.

For composite beams, the EOR will add a multiplier of anywhere between 1.5 and 2.3 on top of this shear to account for the increased moment capacity due to composite action with the concrete slab. For cantilevers, the EOR should be careful because this method is inappropriate, since the maximum total uniform load tables are based on simple span and cantilevers are usually not governed by strength.

For the EOR, this is the simplest method, just a quick note on the drawing. The EOR knows that as long as the beam works in bending (often from their analysis model), the shear connection will work. So the connection is designed for the maximum load it can support. This is often very conservative and inapproiate. It is a very costly method for the owner and fabricator and always leads to larger connections than necessary.

Types and Capacity of Shear Connections

Type 1: Beam to Beam Connections

Generally beam–to-beam connections have at least a top cope. Therefore, the capacities are difficult to calculate (cope section, block shear, etc). These are the most common connection on a project, yet they are often deemed as insignificant and “simple”. This is not the case.

Another complexity is when double angles are required on a project. If all the bolts are shared on each side of the girder web, an erection bolt (or other aid) must be added to the connection to be able to build and meet OSHA requirements. This can lead to problems with fit up and erection sequencing.

The EOR may not realize this, but when requiring the use of double angles for beam-girder connections, it is forcing the detailer to add erection bolts and often to extend the connection angles. In addition, it may affect the erection sequence and force the erector to place the floor beams in a specific sequence. For example, in the case where beams of different depths frame on either side of a girder and share bolts, the deeper beam may have to be erected before the shallower beam on the opposite side of the girder web (so the lower bolts can serve as the erection aid). This can cause delays. A clever detailer will stagger the angles on each side of the same beam web such that either beam can be erected first, but these angles may not fit due to the greater web clearance height required.

An example of inefficient use of connection material is the use of double angles to connect light beams with thin webs. Using 5/16” thick angle legs on each side of a beam web when the web is only a quarter inch is wasteful, yet very common. Furthermore, for beams with weights less than 30plf, it is not the connection angles that control the capacity; it is usually the web in block shear, coped section, or shear rupture (or bolt shear). Therefore, it is the author’s opinion that the EOR should allow the fabricator the freedom to use shear tabs for these reasons. Please note, the bolts in Figure 3 do not need to be staggered for 4” angle legs. If not staggered, this connection will be easier to erect if the shop installs the bolts to the beam web such that the orientation of the tail end of the bolts never meet (spiral pattern in plan).

Type 2: Beam to Column Flange Connections

The simplest connection for an erector to a column flange is a shear tab as shown in Figure 4.

If double angles are used, it may be important to stagger the bolts in this configuration. For the erector to have access to the tails of the column bolts using the TC bolt gun, the tails will always be facing out. This could cause interference with the shop installed bolts on the beam when two tails are on the same side of the beam web. Therefore, the author stronger recommends shear double angle shear connections to column flanges have staggered bolts.

Type 3: Beam to Column Web Connections

Double angles are best for beam-to-column web connections. Erectors that like the use of TC bolts in the field do not like shear tabs since the column flange interferes with the bolt gun.

 

Key Takeaways for EOR

  • If the EOR is not designing all the shear connections, then require calculations by a PE registered in the state of the project for all connections, including shear connections, to be submitted for approval (similar to all connections). Do not put a table indicating the number of bolts only without checking every limit state of every connection.
  • Try to add shears to the plans (method 1) or provide good table (method 2) – do not use note about the uniform load table method (method 3).
  • Do not require double angles when shear tabs work
  • Let the fabricator and/or fabricator’s engineer select the type of shear connection. Shear tabs are generally preferred for beam-to-beam and beam-to-column flange connections.
  • It is more efficient and cost effective for the fabricator to hire or staff an engineer to design connections specific to their shop and erection standards and practices (e.g. shop bolted, staggered bolts for double angle connections, shop standards for connection material, etc)

 

Architects & Engineers Emergency Response Task Force 7

Erik Nelson participated in the Architects & Engineers Emergency Response Task Force 7 response to "Vigilant Guard" Exercise in Exeter, RI on Wednesday, August 1, 2012.  We went to inspect various building and determine whether they were safe or required various placards limiting access.   Here are some photos of the exercise:

AEER-TF7 is trying to understand how to properly inspect damaged buildings after an extreme event.   We inspected and filled out ATC forms at 4 different buildings.  These forms require comments such as "percent damaged" (this may be area of damage - or - cost of repair/replacement, and if cost could it be more than assessed value or property?  Broken windows in a distressed area may account for 50% of the assessed  value of property but only 5% of the area of damage, etc).  Also, we discussed what types of damage should be red and not yellow - since many of us used placards differently.

It was a very succesful event for us second responders.

Comparison of International Existing Building Code 2012 versus the Rhode Island State Rehabilitation Code

At the request of the Building Code Standards Committee of the RI State Building Code Commission, the Structural Engineers Association of Rhode Island (SEARI) Building Code Subcommittee created this document.  Erik Nelson and Ethan Tirrel of Structures Workshop created this document with the help of David Odeh and other members of SEARI's Building Code Committee.  It compares and contrasts the basic structural provisions of the current Rhode Island State Rehabilitation Code 2002 (“RI SRC-1”) with the 2012 Edition of the International Existing Building Code (“IEBC 2012”).  The IEBC 2012 code will be replacing the SRC-1 code in 2013. Comparison of RI Rehab Code SRC 2002 vs IEBC 2012 Final

The purpose of this document is to provide an overview of the two codes and major changes to building structural design provisions that would occur if Rhode Island chooses to adopt the IEBC 2012 to replace the Rehab Code.

Objective Beauty and Fazlur Kahn

Last week, Structures Workshop was recommended for a very small project to a new client by the daughter of the great structural engineer Dr. Fazlur Kahn, Yasmin Kahn.    This was a great honor for us to be recommended by Yasmin, also a structural engineer and prolific writer. I found this picture of them: After learning about this, I started thinking about Dr. Fazlur Kahn and how much he contributed to my profession but also to the skyline of my hometown, Chicago.  I was mesmerized as a child living in the northern suburbs of Chicago by glimpses, on clear days, of the John Hancock and Sears Tower.  I wondered to myself if those memories contributed to my desire to one day become a structural engineer.  I wanted to learn more about Dr. Fazlur Kahn and recently bought the book Engineering Architecture: the Vision of Fazlur Kahn which was written by his daughter Yasmin Kahn.  I am reading it currently and it is a terrific book. To my delight, I have something in common with Dr. Fazlur Kahn.   When he was 29, in 1958, and living in East Pakistan, two of his favorite books were Will Durrant’s Story of Philosophy and George Santayana’s The Sense of Beauty.  I was about the same age when I read the The Sense of Beauty.  It was 2001 in my case, and I was working at Thornton-Tomasetti in New York City and taking Philosophy classes at the New School at night.  I remember The Sense of Beauty well – it was much easier than the other readings required for the Philosophy of Aesthetics course I was taking, and much better in many ways.  This was a time when I thought beauty was objective – it just needed to a part of Plato’s archetypal forms.  Since architectural beauty consisted of form and extension (today what we call proportion), then it is independent of subjects (unlike smell, taste, sound, touch).  Form could be part of “the thing in itself” (Kant’s Noumenal World as opposed to his Phenomenal World of mere appearances – i.e. Plato's Cave).  I thought that if the beauty was related to form, then it could become objective and viewed within Schopenhauer’s “will” (as opposed to representation).  Another way to consider it objective is to say that beauty is part of Carl Jung’s “collective unconscious” (that is, beauty being a part the unconscious brain which is shared by all).   Then, saying that something is beautiful (or ugly) can be universally and collectively accepted as fact (if form and extension have independent realities from our selves).  I may have changed my view on this over time, but even so, I believe the Sears Tower and the John Hancock are objectively beautiful - and it is thanks to Dr. Fazlur Kahn.

• Settings >> Advanced >> Code Injection >> Footer